MASwings Award Sepang Aircraft Engineering with 5 ATR72 A4+OOP Checks & 1 C2+D2 Check

With our growing experience and capabilities in carrying our Checks for the ATR72 fleet within the South East Asia region, MASWINGS of Malaysia have entrusted Sepang Aircraft Engineering to carry out 5 routine A4+OOP checks starting late December 2016.

Sepang has completed 4 ATR72 aircrafts of MASWINGS by February 2017 and the remaining checks are expected to be completed by end May 2017